Customer Contract Description (scope and description of works and services, main T&Cs) Commenced Completion
Kirishskaya State District Power Plant, branch of OGC-6, wholesale generation company Power engineering equipment repair at Kirishskaya State District Power Plant 2009 2009
Kirishskaya State District Power Plant, branch of OGC-6 Maintenance and repair of industrial heating and electrical heating equipment, instruments and automatics 2009 2009
Ryazanskaya State District Power Plant,  branch of OGC-6 Scheduled maintenance of boilers, stages 1,2,3,4,5,6 2009 2009
Krasnoyarskaya State District Power Plant-2, branch of OGC-6 Major overhaul of 1st stage power generation unit, power 150 MW 2009 -
Surgutskaya State District Power Plant-1, branch of OGC-2 Major overhaul of industrial heating hardware 2010 2011
Kirishskiy Integrated Housebuilding Plant Maintenance and repair of instruments and automatics, industrial heating and electrical heating equipment 2010 2010
Cherepovetskaya State District Power Plant, branch of OGC-2 Maintenance and repair of main and auxiliary equipment 2011 2011
Troitskaya State District Power Plant, branch of OGC-2 Reconstruction of 4th stage boiler: water economizer, 3rd stage superheater and recovery air heater packing replaced according to design 2010 -
Troitskaya State District Power Plant, branch of OGC-2 Reconstruction of 4th stage PK-39 boiler: water economizer, 3rd stage superheater and recovery air heater packing replaced according to design 2010 2010
Troitskaya State District Power Plant, branch of OGC-2 Major, mid-life and routine maintenance and repairs of 1st, 2nd and 3rd boiler-turbine shops equipment 2010 2011
Stavropolskaya State District Power Plant, branch of OGC-2 Major, mid-life and routine maintenance and repairs of the auxiliary equipment 2010 2010
Ryazanskaya State District Power Plant, branch of OGC-6 Repair and maintenance of 1st, 2nd and 3rd boiler-turbine shops equipment 2011 2011
Spetsremenergo Manufacture and supply of metalworks for  chumney gas vent pipes Н=320 m, stage 2 of  Ryazanskaya State District Power Plant, branch of OGC-6 2011 2011
Ryazanskaya State District Power Plant, branch of OGC-6 Repair of 1-7 stage turbines 2011 2011
Cherepovetskaya State District Power Plant, branch of OGC-2 Maintenance and repair of main and auxiliary process equipment 2011 2011
Troitskaya State District Power Plant, branch of OGC-2 Repair and maintenance of 1st, 2nd and 3rd boiler-turbine shops equipment 2011 2011
Surgutskaya State District Power Plant-1, branch of OGC-2 Routine repairs and maintenance of industrial heating hardware 2011 2013
Troitskaya State District Power Plant, branch of OGC-2 Major, mid-life and routine maintenance and repair of 2nd and 3rd boiler-turbine shops equipment 2011 2011
PRO GRES Supply of equipment for power generation unit No.8 2011 2011
Surgutskaya State District Power Plant-1, branch of OGC-2 Mid-life repair of industrial heating hardware 2011 2013
Surgutskaya State District Power Plant-2, branch of OGC-2 Major overhaul of industrial heating hardware 2011 2013
Stavropolskaya State District Power Plant, branch of OGC-2 Major overhaul, mid-life repair and maintenance of main equipment (Turbine and Boiler Repair Shops) 2011 2011
Stavropolskaya State District Power Plant, branch of OGC-2 Major overhaul, mid-life repair and maintenance of auxiliary equipment (Auxiliary Turbine and Boiler Equipment Repair Shops) 2011 2011
Stavropolskaya State District Power Plant, branch of OGC-2 Major overhaul, mid-life repair and routine maintenance of electrical equipment (Electrical Shop) 2011 2011
Krasnoyarskaya State District Power Plant-2, branch of OGC-6 Repair of main and auxiliary equipment along with overall TPP equipment 2011 2011
Cherepovetskaya State District Power Plant, branch of OGC-2 Maintenance of dust treatment systems of units 1-3, power 210 MW 2012 2014
Cherepovetskaya State District Power Plant, branch of OGC-2 Maintenance (actual maintenance and repair scope covered) of thermal automation ТВ instruments 2012 2014
Kirishskaya State District Power Plant, branch of OGC-6 Maintenance and repair of industrial heating and  electrical heating equipment and instrumentation 2012 2014
Novocherkasskaya State District Power Plant, branch of OGC-2 Repair and maintenance of main and auxiliary equipment in chemical shop 2012 2014
Novocherkasskaya State District Power Plant, branch of OGC-2 Recovery repair of parts and components of main and auxiliary equipment, repair of machining equipment 2012 2014
Stavropolskaya State District Power Plant, branch of OGC-2 Major overhaul, mid-life repair and maintenance of main equipment (Turbine and Boiler Repair Shops) 2012 2012
Ryazanskaya State District Power Plant, branch of OGC- Repair and maintenance of hydraulic ash handling and dust treatment systems 2012 2014
Ryazanskaya State District Power Plant, branch of OGC-6 Repair and maintenance of overall plant electrical equipment, power generation units Nos. 1,3,4,5,6,7 2012 2014
Ryazanskaya State District Power Plant, branch of OGC-6 Repair and maintenance of overall Shop equipment, 1st, 2nd and 3rd boiler-turbine shops 2012 2014
EM-Alliance Development of detailed workshop and installation/ hookup documents, manufacture of dust removers and coal pipes for P-67 boiler, 3rd stage at Berezovskaya State District Power Plant 2012 2012
Krasnoyarskaya State District Power Plant-2, branch of OGC-6 Repair of main and auxiliary equipment 2012 2014
Krasnoyarskaya State District Power Plant-2, branch of OGC-6 Maintenance and repair of hydraulic and pneumatic ash handling and slag disposal equipment, recycling water systems, sewer manifold and fire piping of the auxiliary equipment in turbine shop, 2012-2014 2012 2014
Surgutskaya State District Power Plant-1, branch of OGC-2 Maintenance and routine repair of industrial heating hardware 2012 2012
Surgutskaya State District Power Plant-1, branch of OGC-2 Mid-life repair of industrial heating hardware 2012 2012
Kirishskaya State District Power Plant, branch of OGC-6 Major overhaul of power generation unit No.4 2013 2014
Stavropolskaya State District Power Plant, branch of OGC-2 Main equipment repair in 2013 2011 2013
Stavropolskaya State District Power Plant, branch of OGC-2 Electrical equipment repair in 2013 2011 2013
Stavropolskaya State District Power Plant, branch of OGC-2 Auxiliary equipment repair 2011 2013
Ryazanskaya State District Power Plant, branch of OGC-6 Repair and maintenance of overall shop equipment, 1st, 2nd and 3rd boiler-turbine shops 2013 2013
Krasnoyarskaya State District Power Plant-2, branch of OGC-6 Twenty-four-hour troubleshooting at the power plant in 2012 till 31.01.2013 2012 2013
Krasnoyarskaya State District Power Plant-2, branch of OGC-6 Twenty-four-hour troubleshooting at ain and auxiliary equipment of boiler-turbine shops 1 and 2 2013 2013
Surgutskaya State District Power Plant-1, branch of OGC-2 Routine repair of  industrial heating hardware 2013 2013
Surgutskaya State District Power Plant-1, branch of OGC-2 Major overhaul of industrial heating hardware 2013 2013
 
 