Customer
|
Contract Description (scope and description of works
and services, main T&Cs)
|
Commenced
|
Completion
|
Kirishskaya
State District Power Plant, branch of OGC-6, wholesale generation company
|
Power
engineering equipment repair at Kirishskaya State District Power Plant
|
2009
|
2009
|
Kirishskaya
State District Power Plant, branch of OGC-6
|
Maintenance
and repair of industrial heating and electrical heating equipment,
instruments and automatics
|
2009
|
2009
|
Ryazanskaya
State District Power Plant, branch of
OGC-6
|
Scheduled
maintenance of boilers, stages 1,2,3,4,5,6
|
2009
|
2009
|
Krasnoyarskaya
State District Power Plant-2, branch of OGC-6
|
Major
overhaul of 1st stage power generation unit, power 150 MW
|
2009
|
-
|
Surgutskaya
State District Power Plant-1, branch of OGC-2
|
Major
overhaul of industrial heating hardware
|
2010
|
2011
|
Kirishskiy
Integrated Housebuilding Plant
|
Maintenance
and repair of instruments and automatics, industrial heating and electrical
heating equipment
|
2010
|
2010
|
Cherepovetskaya
State District Power Plant, branch of OGC-2
|
Maintenance
and repair of main and auxiliary equipment
|
2011
|
2011
|
Troitskaya
State District Power Plant, branch of OGC-2
|
Reconstruction
of 4th stage boiler:
water
economizer, 3rd stage superheater and recovery air heater packing
replaced according to design
|
2010
|
-
|
Troitskaya
State District Power Plant, branch of OGC-2
|
Reconstruction
of 4th stage PK-39 boiler: water economizer, 3rd stage
superheater and recovery air heater packing replaced according to design
|
2010
|
2010
|
Troitskaya
State District Power Plant, branch of OGC-2
|
Major,
mid-life and routine maintenance and repairs of 1st, 2nd
and 3rd boiler-turbine shops equipment
|
2010
|
2011
|
Stavropolskaya State District Power Plant, branch of
OGC-2
|
Major, mid-life and routine maintenance and repairs
of the auxiliary equipment
|
2010
|
2010
|
Ryazanskaya
State District Power Plant, branch of OGC-6
|
Repair
and maintenance of 1st, 2nd and 3rd
boiler-turbine shops equipment
|
2011
|
2011
|
Spetsremenergo
|
Manufacture
and supply of metalworks for chumney
gas vent pipes Н=320 m, stage 2 of Ryazanskaya
State District Power Plant, branch of OGC-6
|
2011
|
2011
|
Ryazanskaya
State District Power Plant, branch of OGC-6
|
Repair
of 1-7 stage turbines
|
2011
|
2011
|
Cherepovetskaya
State District Power Plant, branch of OGC-2
|
Maintenance
and repair of main and auxiliary process equipment
|
2011
|
2011
|
Troitskaya
State District Power Plant, branch of OGC-2
|
Repair
and maintenance of 1st, 2nd and 3rd
boiler-turbine shops equipment
|
2011
|
2011
|
Surgutskaya
State District Power Plant-1, branch of OGC-2
|
Routine
repairs and maintenance of industrial heating hardware
|
2011
|
2013
|
Troitskaya
State District Power Plant, branch of OGC-2
|
Major,
mid-life and routine maintenance and repair of 2nd and 3rd
boiler-turbine shops equipment
|
2011
|
2011
|
PRO
GRES
|
Supply
of equipment for power generation unit No.8
|
2011
|
2011
|
Surgutskaya
State District Power Plant-1, branch of OGC-2
|
Mid-life
repair of industrial heating hardware
|
2011
|
2013
|
Surgutskaya
State District Power Plant-2, branch of OGC-2
|
Major
overhaul of industrial heating hardware
|
2011
|
2013
|
Stavropolskaya
State District Power Plant, branch of OGC-2
|
Major
overhaul, mid-life repair and maintenance of main equipment (Turbine and
Boiler Repair Shops)
|
2011
|
2011
|
Stavropolskaya
State District Power Plant, branch of OGC-2
|
Major
overhaul, mid-life repair and maintenance of auxiliary equipment (Auxiliary
Turbine and Boiler Equipment Repair Shops)
|
2011
|
2011
|
Stavropolskaya
State District Power Plant, branch of OGC-2
|
Major
overhaul, mid-life repair and routine maintenance of electrical equipment
(Electrical Shop)
|
2011
|
2011
|
Krasnoyarskaya
State District Power Plant-2, branch of OGC-6
|
Repair
of main and auxiliary equipment along with overall TPP equipment
|
2011
|
2011
|
Cherepovetskaya
State District Power Plant, branch of OGC-2
|
Maintenance
of dust treatment systems of units 1-3, power 210 MW
|
2012
|
2014
|
Cherepovetskaya
State District Power Plant, branch of OGC-2
|
Maintenance
(actual maintenance and repair scope covered) of thermal automation ТВ instruments
|
2012
|
2014
|
Kirishskaya
State District Power Plant, branch of OGC-6
|
Maintenance
and repair of industrial heating and
electrical heating equipment and instrumentation
|
2012
|
2014
|
Novocherkasskaya
State District Power Plant, branch of OGC-2
|
Repair
and maintenance of main and auxiliary equipment in chemical shop
|
2012
|
2014
|
Novocherkasskaya
State District Power Plant, branch of OGC-2
|
Recovery
repair of parts and components of main and auxiliary equipment, repair of
machining equipment
|
2012
|
2014
|
Stavropolskaya
State District Power Plant, branch of OGC-2
|
Major
overhaul, mid-life repair and maintenance of main equipment (Turbine and
Boiler Repair Shops)
|
2012
|
2012
|
Ryazanskaya
State District Power Plant, branch of OGC-
|
Repair
and maintenance of hydraulic ash handling and dust treatment systems
|
2012
|
2014
|
Ryazanskaya
State District Power Plant, branch of OGC-6
|
Repair
and maintenance of overall plant electrical equipment, power generation units
Nos. 1,3,4,5,6,7
|
2012
|
2014
|
Ryazanskaya
State District Power Plant, branch of OGC-6
|
Repair
and maintenance of overall Shop equipment, 1st, 2nd and
3rd boiler-turbine shops
|
2012
|
2014
|
EM-Alliance
|
Development
of detailed workshop and installation/ hookup documents, manufacture of dust
removers and coal pipes for P-67 boiler, 3rd stage at Berezovskaya
State District Power Plant
|
2012
|
2012
|
Krasnoyarskaya
State District Power Plant-2, branch of OGC-6
|
Repair
of main and auxiliary equipment
|
2012
|
2014
|
Krasnoyarskaya
State District Power Plant-2, branch of OGC-6
|
Maintenance
and repair of hydraulic and pneumatic ash handling and slag disposal
equipment, recycling water systems, sewer manifold and fire piping of the
auxiliary equipment in turbine shop, 2012-2014
|
2012
|
2014
|
Surgutskaya State District Power Plant-1, branch of
OGC-2
|
Maintenance
and routine repair of industrial heating hardware
|
2012
|
2012
|
Surgutskaya State District Power Plant-1, branch of
OGC-2
|
Mid-life repair of industrial heating hardware
|
2012
|
2012
|
Kirishskaya
State District Power Plant, branch of OGC-6
|
Major
overhaul of power generation unit No.4
|
2013
|
2014
|
Stavropolskaya
State District Power Plant, branch of OGC-2
|
Main
equipment repair in 2013
|
2011
|
2013
|
Stavropolskaya
State District Power Plant, branch of OGC-2
|
Electrical
equipment repair in 2013
|
2011
|
2013
|
Stavropolskaya
State District Power Plant, branch of OGC-2
|
Auxiliary
equipment repair
|
2011
|
2013
|
Ryazanskaya
State District Power Plant, branch of OGC-6
|
Repair
and maintenance of overall shop equipment, 1st, 2nd and
3rd boiler-turbine shops
|
2013
|
2013
|
Krasnoyarskaya
State District Power Plant-2, branch of OGC-6
|
Twenty-four-hour
troubleshooting at the power plant in 2012 till 31.01.2013
|
2012
|
2013
|
Krasnoyarskaya
State District Power Plant-2, branch of OGC-6
|
Twenty-four-hour
troubleshooting at ain and auxiliary equipment of boiler-turbine shops 1 and
2
|
2013
|
2013
|
Surgutskaya
State District Power Plant-1, branch of OGC-2
|
Routine
repair of industrial heating hardware
|
2013
|
2013
|
Surgutskaya
State District Power Plant-1, branch of OGC-2
|
Major
overhaul of industrial heating hardware
|
2013
|
2013
|